              Townhome style, built 1967

              Central HVAC plant (chiller, cooling towers, boilers, pumps), underground hvac piping with insulation to distribute heated/chilled water

Challenges:

              All equipment is near end of useful life

              The association will spend upwards of $3M for like-kind replacements in near-term. They will spend another $6.7M long-term for underground distribution line replacement.

How we helped:

Reserve study helped the association identify the total near term costs so that this could be compared against new system design, as the new system would abandon the central system and opt for individual systems.

Reserve Study not only helped identify upgrade costs, but also captured 20 year cost of replacing the distribution piping

Knowing near and long-term operational cost savings helped the association to decide if the more expensive near term project was worth it.

Knowing “total” cost can help association better understand real pay-off of operational savings

Lower utility bills for association by upgrading to higher efficiency equipment

Reserve study considered equipment costs from vendors and included energy audits

Facing a major system replacement? We help HOAs make smart, data-driven decisions. Schedule your reserve study consultation today.

Learn More

You may be interested in these other articles.

Subscribe to our newsletter from reserve study specialists

Sign up below to receive helpful tips, information on the laws, and more from our reserve study specialists.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.